Comprehensive List of Overbridges and Flyovers in Guwahati (1935-2024) – Enhancing Connectivity & Urban Growth
the complete list of overbridges and flyovers in Guwahati from 1935 to 2024. Learn how these infrastructural developments have transformed the city's connectivity, reduced congestion, and facilitated urban growth.
Guwahati, the gateway to the Northeast, has witnessed a remarkable transformation in its infrastructure, particularly in its road network. The city's expanding flyover network has been instrumental in addressing the growing traffic congestion and enhancing connectivity.
Location :- Paltan Bazaar
Length :- Approximately 600 meters
Opening Date :- 1986
Connecting Places :- Connects Paltan Bazaar to GS Road, integrating the commercial area with central Guwahati.
Location :- Dispur
Length :- Approximately 800 meters
Opening Date :- 2008
Connecting Places :- Links Dispur with GS Road, facilitating access to the Assam Secretariat and government offices.
Location :- Kahilipara
Length :- Approximately 1.2 kilometers
Opening Date :- 2014
Connecting Places :- Eases traffic flow between Kahilipara and Beltola, connecting the eastern parts of the city with central Guwahati.
Location :- Uzan Bazar
Length :- Approximately 1 kilometer
Opening Date :- 2015
Connecting Places :- Provides a critical link from Uzan Bazar to northern parts of the city, including Maligaon and the Kamakhya Temple.
Location :- Beltola
Length :- Approximately 1 kilometer
Opening Date :- 2017
Connecting Places :- Connects Beltola Tiniali to surrounding areas, improving connectivity in the southern parts of Guwahati.
Location :- Ganeshguri
Length :- Approximately 1.2 kilometers
Opening Date :- 2018
Connecting Places :- Links Ganeshguri to the Assam State Zoo and other central parts of the city.
Location :- Kumarpara
Length :- Approximately 800 meters
Opening Date :- 2019
Connecting Places :- Connects Kumarpara with major junctions, aiding traffic management in this key area.
Location :- Garchuk
Length :- Approximately 1 kilometer
Opening Date :- 2020
Connecting Places :- Enhances connectivity between Garchuk and the Assam Engineering College, improving traffic flow in the western part of Guwahati.
Location :- Bhangagarh
Length :- Approximately 1 kilometer
Opening Date :- 2022
Connecting Places :- Facilitates movement in and around Bhangagarh, connecting major roads leading to various city areas.
Location :- Near Lokpriya Gopinath Bordoloi International Airport
Length :- Approximately 2 kilometers
Opening Date :- 2023
Connecting Places :- Connects the airport to the city center, easing travel for passengers and reducing congestion around the airport.
Location :- Near Assam State Zoo
Length :- Approximately 1.5 kilometers
Opening Date :- 2023
Connecting Places :- Provides improved access to the zoo and surrounding areas, easing traffic congestion in this region.
Location :- Rukminigaon
Length :- Approximately 1 kilometer
Opening Date :- 2024
Connecting Places :- Enhances connectivity in Rukminigaon and surrounding areas, addressing local traffic issues.
Location :- Six Mile
Length :- Approximately 1.2 kilometers
Opening Date :- 2024
Connecting Places :- Facilitates smoother travel between Six Mile and adjacent areas, providing a crucial link to various city parts.
Location :- Near Guwahati Railway Station
Length :- Approximately 1.2 kilometers
Opening Date :- 2021
Connecting Places :- Links the railway station with major city roads, improving traffic management around this busy area.
Location :- Bharalumukh
Length :- Approximately 900 meters
Opening Date :- 2021
Connecting Places :- Connects Bharalumukh to major roads leading towards northern and southern parts of Guwahati, improving overall traffic flow.
Location :- Rukmini Gaon
Length :- Approximately 800 meters
Opening Date :- 2022
Connecting Places :- Enhances access between Rukmini Gaon and major city roads, improving traffic conditions in the area.
Location :- Beltola Tiniali
Length :- Approximately 1 kilometer
Opening Date :- 2023
Connecting Places :- Provides a crucial link from Beltola Tiniali to major roads, easing traffic congestion and improving connectivity.
Location :- Guwahati Bypass Road
Length :- Approximately 2 kilometers
Opening Date :- 2024
Connecting Places :- Facilitates smoother traffic movement along the Guwahati Bypass, enhancing connectivity for vehicles traveling around or through the city.
Location :- Kacharigaon
Length :- Approximately 1 kilometer
Opening Date :- 2024
Connecting Places :- Improves traffic flow and connectivity between Kacharigaon. and other parts of Guwahati.
Location :- Sarumati
Length :- Approximately 900 meters
Opening Date :- 2024
Connecting Places :- Enhances access to Sarumati and major roads leading into and out of Guwahati.
Location :- Connecting Garchuk and Khetri
Length :- Approximately 1.5 kilometers
Opening Date :- 2024
Connecting Places :- Facilitates smoother travel between Garchuk and Khetri,
improving connectivity between these areas and the rest of the city.
Location :- Connecting Kahilipara and Hatigaon
Length :- Approximately 1 kilometer
Opening Date :- 2024
Connecting Places :- Improves traffic flow between Kahilipara and Hatigaon, addressing congestion in these busy areas.
Check more posts :
APSC Previous Year Papers PDFs
APSC Posts List, Salary and Perks
Why APSC Mock Tests Are So Important for Success
How to Prepare for APSC Prelims?
Best Books for APSC Pre and Mains
APSC Syllabus: Pre, Mains and Interview
Zoo Road Centre, 3rd floor, Royal Circle Building, Opposite Spanish Garden, Zoo Road, Guwahati-781005